by TANZ Technical Group | Sep 12, 2026 | Waterproofing
All tiled showers will have a waste for water to go to the drain. The shower will use either a central drain or a channel drain, which is positioned at the lowest point of the shower for the water to drain to and then be discharged into the plumbing drainpipes. Each...
by TANZ Technical Group | Jun 3, 2026 | Waterproofing
by TANZ Technical Group | Jan 22, 2026 | Education & Training
Is E3/AS1 really achievable? E3/AS1 is considered the primary means to comply with E3. E3 objective and functional requirements are to prevent moisture damage to properties that then results in health issues via mould rot and decay, and to safeguard people’s...